Hi All,
I know there is every likelihood that this subject has been covered, but I cannot find the answers to all of my questions in one place, so if someone has the time, I was looking for a bit of a walk through if possible?
I'm replacing an entire bathroom and whilst removing the old tiles, most of the backing plaster has also come away, leaving me with block work. Looking at the state of the remaining backing plaster, I've decided to remove all of it as I wouldn't trust it to hold any significant weight.
We have two choices when tiling - either floor to ceiling through the entire room, or bath to ceiling around the bath (this will have a concealed TMV shower at one end in studwork) and then tiling to chest height on each wall.
1) I'm going to board all the walls to allow a better chance of getting them truly plumb and square. Can I just use Gyproc Board Adhesive for the cement boards? Will the boards also need to be screwed to the block work? And will a basic PVA primer be sufficient on the block work before the board adhesive?
2) For the non-wet areas (window wall & wall opposite bath) will moisture resistant plasterboard be sufficient as I think this will drastically reduce the cost. What preparation will the MR PB require before tile adhesive is applied?
Any assistance would be greatly appreciated. Once this first phase is sorted out I will undoubtedly be back in touch with further prep questions.
Cheers,
Chris.
I know there is every likelihood that this subject has been covered, but I cannot find the answers to all of my questions in one place, so if someone has the time, I was looking for a bit of a walk through if possible?
I'm replacing an entire bathroom and whilst removing the old tiles, most of the backing plaster has also come away, leaving me with block work. Looking at the state of the remaining backing plaster, I've decided to remove all of it as I wouldn't trust it to hold any significant weight.
We have two choices when tiling - either floor to ceiling through the entire room, or bath to ceiling around the bath (this will have a concealed TMV shower at one end in studwork) and then tiling to chest height on each wall.
1) I'm going to board all the walls to allow a better chance of getting them truly plumb and square. Can I just use Gyproc Board Adhesive for the cement boards? Will the boards also need to be screwed to the block work? And will a basic PVA primer be sufficient on the block work before the board adhesive?
2) For the non-wet areas (window wall & wall opposite bath) will moisture resistant plasterboard be sufficient as I think this will drastically reduce the cost. What preparation will the MR PB require before tile adhesive is applied?
Any assistance would be greatly appreciated. Once this first phase is sorted out I will undoubtedly be back in touch with further prep questions.
Cheers,
Chris.