JohnD said:However, main Bonding is required to incoming metallic services where they enter the building (or come up through a concrete floor) on the consumer's side of the stop cock and any meter.
quote]
Gas meter and pipe work must be within 600mm of meter and before the first T in the pipe work, not where it first enters the building.
dingbat said:RF is referring to the reasons we bond incoming services and it is all to do with introducing a potential (generally earth potential) into the equipotential zone, which is where the occupant may come into contact with parts of the electrical system.
If it doesn't introduce such a potential then there is no need to bond it at all and bonding it outside achieves nothing extra.