I have rather large two story extension to build (7.3x6.6m) at the back of my house. Also the project involves a detached garage (4.6x6.6m) and porch (2.5x4.2m). due to financial constrains I divided the work into 3 phases and would like to manage the project myself
Phase one, ground work and foundation;
this include the following: -
· preparing the ground
· dig out the footings
· concrete the footing
· build the first few rows up to 150mm above the ground
Phase two brick laying work; this include only the brick and block work
Phase 3 Roof
Ant idea how much is the cost for phases one?
Most brick layers I spoke to so far (whom I arranged to meet on site within the next few weeks) claimed they can lay between 600 to 900 bricks a day and a ballet of thermolite block (128 block per day). That depends on the run, access of the sites etc. However if we take the lowest rate (600 brick per day), does this mean the price of laying 600 brick is £250. £250 include the daily rate for brick layer (£150) and daily rate of one laborer (£100). if this is correct then I can easily calculate the brick work cost from calculating the number of bricks I need. this will enable me to consider any reasonable quote
Any thought, help, suggestion would be highly appreciated
Phase one, ground work and foundation;
this include the following: -
· preparing the ground
· dig out the footings
· concrete the footing
· build the first few rows up to 150mm above the ground
Phase two brick laying work; this include only the brick and block work
Phase 3 Roof
Ant idea how much is the cost for phases one?
Most brick layers I spoke to so far (whom I arranged to meet on site within the next few weeks) claimed they can lay between 600 to 900 bricks a day and a ballet of thermolite block (128 block per day). That depends on the run, access of the sites etc. However if we take the lowest rate (600 brick per day), does this mean the price of laying 600 brick is £250. £250 include the daily rate for brick layer (£150) and daily rate of one laborer (£100). if this is correct then I can easily calculate the brick work cost from calculating the number of bricks I need. this will enable me to consider any reasonable quote
Any thought, help, suggestion would be highly appreciated