I have a builder currently sorting a brick opening and will be fitting a composite door into the opening. The aim is to have the inside hallway as wide as possible as going to squeeze a small wc into the hallway, which means trying to put the new door as far left to the inside wall as possible.
There is a pillar that supports a porch type roof, initially the builder thought it was ok to cut down the pillar with the aim of being able to install the new door further left and leave more space in hallway, this was what as agreed at part of the agreed price. However, now the builder says this wouldn't be a good idea and that it would be better to just remove the inner leaf of the brickwork, and install the composite door so that it sits behind the outer leaf brickwork slightly, with the door being plastered upto on the inside. This way, the pillar doesn't need to be cut on the outside and the job will look better he advises, as well as not risking any movement so to the porch roof. He has already removed some of the inner leaf of brickwork to allow the new door frame to be butted up against it, with the outer leaf not being touched as of yet.
I am a bit worried about putting the door behind the brickwork, as if it ever needed to be changed it would mean hacking out a lot of plaster from the inside to free the door enough to remove it. I am also not sure whether removing the extra bricks on the outer leaf would be any risk to the small roof its supporting as there are many other spots its supported anyway. I have a feeling he just doesn't want to cut the outer brickwork as its just more work for him, and essentially the door would be fitted in the same place either way, the only difference being that leaving the outer leaf would block the door from being removed easily and would require a massive amount of internal plaster damage if ever required.
So, any advice on how to tackle the job and do this the best way would be appreciated.
There is a pillar that supports a porch type roof, initially the builder thought it was ok to cut down the pillar with the aim of being able to install the new door further left and leave more space in hallway, this was what as agreed at part of the agreed price. However, now the builder says this wouldn't be a good idea and that it would be better to just remove the inner leaf of the brickwork, and install the composite door so that it sits behind the outer leaf brickwork slightly, with the door being plastered upto on the inside. This way, the pillar doesn't need to be cut on the outside and the job will look better he advises, as well as not risking any movement so to the porch roof. He has already removed some of the inner leaf of brickwork to allow the new door frame to be butted up against it, with the outer leaf not being touched as of yet.
I am a bit worried about putting the door behind the brickwork, as if it ever needed to be changed it would mean hacking out a lot of plaster from the inside to free the door enough to remove it. I am also not sure whether removing the extra bricks on the outer leaf would be any risk to the small roof its supporting as there are many other spots its supported anyway. I have a feeling he just doesn't want to cut the outer brickwork as its just more work for him, and essentially the door would be fitted in the same place either way, the only difference being that leaving the outer leaf would block the door from being removed easily and would require a massive amount of internal plaster damage if ever required.
So, any advice on how to tackle the job and do this the best way would be appreciated.