Hi everyone
I am about to have a go building my house extension, but have not have any building experience in building a wall before. I would appreciate for any responses to the following questions:
1. When building a cavity wall with engineering bricks below the DPC level, should both skins be constructed at the same time? I wonder, if it okay to build the inner skin first and concrete the floor slab. Then build the outer skin.
2. When building the inner skin of the cavity wall, below the DPC level, do you plumb the wall on the interior face or the exterior face (this is the face in the cavity)?
3. How long mortar joints normally take to dry, before they can stand up to rain water - after a heavy rain, we get quite a bit of water in the trench.
Many thanks!
I am about to have a go building my house extension, but have not have any building experience in building a wall before. I would appreciate for any responses to the following questions:
1. When building a cavity wall with engineering bricks below the DPC level, should both skins be constructed at the same time? I wonder, if it okay to build the inner skin first and concrete the floor slab. Then build the outer skin.
2. When building the inner skin of the cavity wall, below the DPC level, do you plumb the wall on the interior face or the exterior face (this is the face in the cavity)?
3. How long mortar joints normally take to dry, before they can stand up to rain water - after a heavy rain, we get quite a bit of water in the trench.
Many thanks!