Hello All
My 70's lean-to conservatory is being replaced with a new conservatory extension ie wall into living space will be opened up. Building regs stipulates new strip foundation as a result. ive read Southern water declaration of works guidance and the bit that may be relevant is :
"If the total coverage of the public sewer(s) (foul, surface water or both) exceeds 6 metres (including pipe work already built over) you’ll need to submit a build over agreement"
the length of the conservatory is a touch under 6m
Any thoughts would be very much appreciated
I have a public sewer
My 70's lean-to conservatory is being replaced with a new conservatory extension ie wall into living space will be opened up. Building regs stipulates new strip foundation as a result. ive read Southern water declaration of works guidance and the bit that may be relevant is :
"If the total coverage of the public sewer(s) (foul, surface water or both) exceeds 6 metres (including pipe work already built over) you’ll need to submit a build over agreement"
the length of the conservatory is a touch under 6m
Any thoughts would be very much appreciated
I have a public sewer