Hello,
Help,advice, panic mode is on. Comments please on the sudden extras bill close to £10k from the builder for our single storey rear kitchen diner extension. (building quote cost £20k with allowances for waste, a degree of electrics and plumbing). Nothing is/was hidden and all was seen at the quote bar the extra lighting we wanted.
For us the extras we were prepared for was extra lighting (downlighters) and a few minor plumbing things - outside tap and plumbing for fridge freezer.
What we got was a shocker........ most of which should have been included as per the quote. Bearing in mind we are 7 weeks in now and none of this was either mentioned or priced and we suddenly got it dumped on us. Wiring/plumbing is prertty much done first fix and plaster board mostly up. Surprise, surprise we get the extras bill now !
I am seeing the MD of the company tomorrow and hope to discuss this in detail to see what gives. I feel a bit stupid as I have been too trusting not expecting to get turned over. I spoke to him today and he said we would sort things out but what that means I don't know. I want to pay for what is fair and not get ripped off.
Renew existing drain chamber - £250
Extra drilling of steel supports - £350
Board/skim existing dining room kitchen ceilings £500
Board/skim exterior wall of diner to make up for cavity size £250
Extra size of extension - £1500 (apparently 450mm larger than plan)
Electrics
Downlighters 10 £450
Downlighters 12 £480
Remote dimmer £135
8 double sockets £500
Replace smoke detector to hall and fit to kitchen £250
New consumer unit £650 (do I need one ?)
Plumbing £1750 ...
outside tap - fridge feed
rerun mains to new sink point
cap off old gas pipe - no rerun needed
run new services and waste
Any advice please on whats needed/not fair/not. I'm quite prepared to do part/some of this myself and source lights/sockets etc but an extras bill of half the original quote means I may have to sell one of my children.
Help please !
Timmo
sorry just realised I posted this in electrics - mods please move to general building if need be - thanks
Help,advice, panic mode is on. Comments please on the sudden extras bill close to £10k from the builder for our single storey rear kitchen diner extension. (building quote cost £20k with allowances for waste, a degree of electrics and plumbing). Nothing is/was hidden and all was seen at the quote bar the extra lighting we wanted.
For us the extras we were prepared for was extra lighting (downlighters) and a few minor plumbing things - outside tap and plumbing for fridge freezer.
What we got was a shocker........ most of which should have been included as per the quote. Bearing in mind we are 7 weeks in now and none of this was either mentioned or priced and we suddenly got it dumped on us. Wiring/plumbing is prertty much done first fix and plaster board mostly up. Surprise, surprise we get the extras bill now !
I am seeing the MD of the company tomorrow and hope to discuss this in detail to see what gives. I feel a bit stupid as I have been too trusting not expecting to get turned over. I spoke to him today and he said we would sort things out but what that means I don't know. I want to pay for what is fair and not get ripped off.
Renew existing drain chamber - £250
Extra drilling of steel supports - £350
Board/skim existing dining room kitchen ceilings £500
Board/skim exterior wall of diner to make up for cavity size £250
Extra size of extension - £1500 (apparently 450mm larger than plan)
Electrics
Downlighters 10 £450
Downlighters 12 £480
Remote dimmer £135
8 double sockets £500
Replace smoke detector to hall and fit to kitchen £250
New consumer unit £650 (do I need one ?)
Plumbing £1750 ...
outside tap - fridge feed
rerun mains to new sink point
cap off old gas pipe - no rerun needed
run new services and waste
Any advice please on whats needed/not fair/not. I'm quite prepared to do part/some of this myself and source lights/sockets etc but an extras bill of half the original quote means I may have to sell one of my children.
Help please !
Timmo
sorry just realised I posted this in electrics - mods please move to general building if need be - thanks