Have a single-storey extension built to create a new kitchen/dining room area. Used an architect to draft plans and designed with folding-sliding doors on the back (which look stunning but should do after the money I spent on them!).
Submitted a Building Notice rather than Full Plans Application as fairly simple extension. The builder called the BC Surveyor in to check the work at all the relevant stages and no issues or concerns were ever raised. Now we've applied for Completion Certificate and the regular BC officer is off on maternity leave, completely uncontactable, and the replacement says there is no record of any of her visits. And he isn't happy with the size of the folding-sliding doors as he says they are >25% of the floor space so not within building regs -all this from a 2 minute visit where all he did was stand in the kitchen and take a quick look at the extension roof from outside - he took no measurements or anything.
He told my builder all this, so I called him to ask what was happening and he said they still can't find the BC visit records!
So literally a minute after this phone call, knock at the door, 'hello Building Control' - this time a different guy, walks in, looks around, checks the elec. cert and says 'you'll get your certificate next week, no problem'.
Has anyone else had this kind of problem with BC where the left-hand doesn't know what the right-hand is doing?
Submitted a Building Notice rather than Full Plans Application as fairly simple extension. The builder called the BC Surveyor in to check the work at all the relevant stages and no issues or concerns were ever raised. Now we've applied for Completion Certificate and the regular BC officer is off on maternity leave, completely uncontactable, and the replacement says there is no record of any of her visits. And he isn't happy with the size of the folding-sliding doors as he says they are >25% of the floor space so not within building regs -all this from a 2 minute visit where all he did was stand in the kitchen and take a quick look at the extension roof from outside - he took no measurements or anything.
He told my builder all this, so I called him to ask what was happening and he said they still can't find the BC visit records!
So literally a minute after this phone call, knock at the door, 'hello Building Control' - this time a different guy, walks in, looks around, checks the elec. cert and says 'you'll get your certificate next week, no problem'.
Has anyone else had this kind of problem with BC where the left-hand doesn't know what the right-hand is doing?