I've had a lot of work carried out, mostly by a builder, and although I knew that it would need signing off, I did not realise that it was a requirement to make the council aware that you were planning to carry out works, as the builder did not tell me this. Granted I completely agree that I had a responsibility to look into it, but here we are...
I was originally going to go through the builder to get everything signed off, but I'm losing patience with how long it's taking him to do tasks, so out of fear that it will take months for him to get around to sorting out building control, I'm trying to get it sorted myself.
I'm worried though that pretty much everything that building control would need to see has been done (albeit mostly still visible), and I didn't give any notice to the council to get it approved.
Does anyone know what is likely to happen with this? I've got calculations, etc. for the steels I've had put in, and I'm pretty confident it's as per the regs, so it's not so much a lack of compliance that I'm concerned about.
For reference, the following is what I've had done:
I was originally going to go through the builder to get everything signed off, but I'm losing patience with how long it's taking him to do tasks, so out of fear that it will take months for him to get around to sorting out building control, I'm trying to get it sorted myself.
I'm worried though that pretty much everything that building control would need to see has been done (albeit mostly still visible), and I didn't give any notice to the council to get it approved.
Does anyone know what is likely to happen with this? I've got calculations, etc. for the steels I've had put in, and I'm pretty confident it's as per the regs, so it's not so much a lack of compliance that I'm concerned about.
For reference, the following is what I've had done:
- Replacement of pre-existing (installed before I owned the house) structural beam as previous beam was unsafe
- Removal and supporting of load-bearing wall
- Re-routing of soil pipe above ground and new connection into original below ground soil pipework
- Removal of chimney breast
- Replacement of external door
- Relaying of pre-existing (installed before I owned the house) concrete floor as previous floor was uneven complete with insulation and damp-proof course