Planning on building an extension to widen the kitchen & garage by approx 2ft which is approx 6" short of the boundary - I've got plannig permission for this. I've dug 2 trial holes either end of the extension to determine the depth of the foundations. At one end I've come across a clay drainage pipe which would clash with the foundations by approx 1". The other end of the extension, the clay pipe is further out so no problem.
Is there anyway the foundation can be built around the pipe?
Is there anyway the foundation can be built around the pipe?