Hi All,
2 years back we had a wall knocked down in our kitchen to merge the dining room and kitchen together, as well as had our integral garage partly blocked up and a window put in place.
We had a builder complete this work. All of it has been done under permitted development.
The wall was pulled down, RSJ put in place and room decorated, job done. The garage has had the garage door half blocked up and a window in place. However, the conversion has stalled due to funds, so as it stands we still have a typical “garage”.
Now, our builder and the building control people have said they cannot sign it all off as the garage conversion has not been completed, fair enough. Apparently the kitchen and dining knock through falls under the same “project” so even that can’t be signed off.
They have provided a “letter of reassurance” which basically says everything completed so far is good and they can sign off once the garage is converted.
Does this sound right?
2 years back we had a wall knocked down in our kitchen to merge the dining room and kitchen together, as well as had our integral garage partly blocked up and a window put in place.
We had a builder complete this work. All of it has been done under permitted development.
The wall was pulled down, RSJ put in place and room decorated, job done. The garage has had the garage door half blocked up and a window in place. However, the conversion has stalled due to funds, so as it stands we still have a typical “garage”.
Now, our builder and the building control people have said they cannot sign it all off as the garage conversion has not been completed, fair enough. Apparently the kitchen and dining knock through falls under the same “project” so even that can’t be signed off.
They have provided a “letter of reassurance” which basically says everything completed so far is good and they can sign off once the garage is converted.
Does this sound right?