Hello there, I am completing the paperwork for my installation of a 3kw multifuel stove. The constructional heath consisted of concrete at least 25mm thick above the subfloor (no idea how thick that is) and topped with a granite hearth, which is again 25mm thick.
This leads me to the following question:
Someone from building regulations visited today and approved the slab, I just need to complete this paperwork to get it signed off.
Thanks for your help.
This leads me to the following question:
Hearth, form of construction. New or existing?
Examples:
New. Tiles on concrete
floor. 125mm thick. As Diagram 25 AD J
Existing hearth for solid fuel fire, with fender.
New. Solid floor
Min 125mm concrete above DPM. As Diagram 42, ADJ
Can someone please tell me which diagram I should be referring to in relation to my installation? I can't even see a diagram 42 in the document mentioned.Examples:
New. Tiles on concrete
floor. 125mm thick. As Diagram 25 AD J
Existing hearth for solid fuel fire, with fender.
New. Solid floor
Min 125mm concrete above DPM. As Diagram 42, ADJ
Someone from building regulations visited today and approved the slab, I just need to complete this paperwork to get it signed off.
Thanks for your help.
Last edited: