Hi All
My job over the christmas break is to put up the new ceiling, and dry line 2 of the walls in the lounge
I'm using 12mm plasterboard for both (is that ok?)
I'm trying to decide if I should put the ceiling up first, and then butt the dry lining upto the ceiling, or the other way round - put the 'walls' up first, then butt the ceiling up to that
is there a usual way to do it, or does it not really matter?
no, i'm not living in it over xmas
thanks all
My job over the christmas break is to put up the new ceiling, and dry line 2 of the walls in the lounge
I'm using 12mm plasterboard for both (is that ok?)
I'm trying to decide if I should put the ceiling up first, and then butt the dry lining upto the ceiling, or the other way round - put the 'walls' up first, then butt the ceiling up to that
is there a usual way to do it, or does it not really matter?
no, i'm not living in it over xmas
thanks all