I'm close to exchanging contracts on a property that appears to have no planning consent for an extension or any of the other major works carried out on it.
The major works are:
1. Extension (over 30 years ago)
2. New CU and wiring for kitchen, garden pond and garden summer house (last four years);
3. A double-glazed window in bathroom (within last four years);
4. Cold water feed into integral garage + tank (within last four years);
5. Removal of internal wall (within last four years);
Would it be a big problem for me in the future if the property did not have building control approval or certificates for the above?
The major works are:
1. Extension (over 30 years ago)
2. New CU and wiring for kitchen, garden pond and garden summer house (last four years);
3. A double-glazed window in bathroom (within last four years);
4. Cold water feed into integral garage + tank (within last four years);
5. Removal of internal wall (within last four years);
Would it be a big problem for me in the future if the property did not have building control approval or certificates for the above?