c,s or y- plan. advice very much appreciated?

Joined
25 Oct 2008
Messages
8
Reaction score
0
Location
Oxfordshire
Country
United Kingdom
hi new to all this, so bare with me.

i have a gravity hw and pumped ch system working from a floor standing ideal mexico boiler. there are no motorised valves in the system.
i have bought a cylinder stat a programable room stat a honeywell wiring box and the siemans programer, i have a 3 way motorised valve intending to convert it into a fully pumped system.

i would very much appreciate any advice on this. where the pump and valve should be positioned, safety issues ie:venting etc.
is it ok to have bends going to the valve or are there limits on them.

i am tempted to just put a 2way 28mm valve in the hw side and make a c-plan as this seems much easier. #
what are the pros and cons between a c,y and s plan?
the pipe work is very tight in and around the boiler, so the least amount of re-arranging pipes the better

i am hoping to start the work very soon but need a littlehelp and inspiration.
cheers
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top