It's looking likely that the most practical route that I will have to take for the ring is across a concrete floor. There is a relatively short section which is where I would take it and run parallel to the walls. It will need to take 2 off 2.5 T+E cables, and wouild be concreted over then tiled, so no real access afterward, so can you tell me
1) Is there a minimum depth I need to burry the cables,
2) do I need to use steel conduit, or can I just use capping.
3) do I need to cover with protective markings
4) any reason not to do this
thanks
1) Is there a minimum depth I need to burry the cables,
2) do I need to use steel conduit, or can I just use capping.
3) do I need to cover with protective markings
4) any reason not to do this
thanks