- Joined
- 31 Oct 2015
- Messages
- 291
- Reaction score
- 1
- Country
am currently laying a type 1 sub base ready for a new porcelain patio. I need 2 steps building, and have been told can build these (each step will be 1 brick high) straight onto the compacted type 1, is this correct?
Just wanted to check
Just wanted to check