I currently have 22mm feed and return running to a point under the landing where they're connecting to microbore manifolds which then feed each rad sperately.
I want to change a few rads around and would prefer to upgrade to 15mm due to the length of the pipe runs involved and the addition of radiators in certain rooms.
Is it ok to remove the manifolds and fit a 'Y' or 'T' piece and then have 2 branches in 22mm going to either end of the house where I can then tee of with 15mm spurs to radiators along each run.
I wasn't sure whether I would have to have one big 22mm loop that goes around the house with 15mm spurs coming off where necessary or whether I can split the 22mm in the way described above? I'm also worried that the pump might suffer with more water in the system and having to push it around more places (i.e. split directions in 22mm pipe)...but thinking about it, with microbore systems you have more pipes and each is filled with water so presumably it'll be roughly the same give or take..?
Also, where I need to feed a single rad I'm assuming I can just tee of a 15mm spur to that rad. But when I have a cluster of 2-3 rads in one area is it ok to run these from the one 15mm spur providing I dont exceed 3.5kw?
Cheers Guys
I want to change a few rads around and would prefer to upgrade to 15mm due to the length of the pipe runs involved and the addition of radiators in certain rooms.
Is it ok to remove the manifolds and fit a 'Y' or 'T' piece and then have 2 branches in 22mm going to either end of the house where I can then tee of with 15mm spurs to radiators along each run.
I wasn't sure whether I would have to have one big 22mm loop that goes around the house with 15mm spurs coming off where necessary or whether I can split the 22mm in the way described above? I'm also worried that the pump might suffer with more water in the system and having to push it around more places (i.e. split directions in 22mm pipe)...but thinking about it, with microbore systems you have more pipes and each is filled with water so presumably it'll be roughly the same give or take..?
Also, where I need to feed a single rad I'm assuming I can just tee of a 15mm spur to that rad. But when I have a cluster of 2-3 rads in one area is it ok to run these from the one 15mm spur providing I dont exceed 3.5kw?
Cheers Guys