Someone Asked me for a rough quide how much for this.
I canno do it due to the certs required.

As I dont personally do this work I have no idea of cost, but simply ask COULD it be more than £500 .
That will be sufficient for them to decide.

I would say due to the testing etc, it possibly would, but I dont know

They only wanted the cooker supply installed , but the mains was such a state it really needs a new board etc to do so safely.

Three bedroom house with TN-S supply
There is no parking costs, or nothing like that.

1, Supply and wire to point for new oven/hob unit, load unknown assume one switch 45amp max, no socket.
oven/hob to be Fitted by kitchen fitters
Aprox 4 met run surface wired

2, remove 8 way and 4 way fuseboxes and fit 12 way minimum cu (wylex hager or mem or similar).
Wiring appears to be twin and earth


3 All mcb's and rcd's fitted so ALL circuits conform as required to 17th if any different to 16th.
*new cooker
*existing shower 45amp
*two seperate garage supplys
*two lighting, up 6a /down 6a
*two rings, up 32a/ down 32a
*aprox four unknown circuits (some power)

supply appears to be TN-S


4 fit earth block , earth gas meter aprox 2 met, earth water aprox 3 met

5 Replace metre tails (aprox two metres) and fit 2 pole isolator if necessary
Owner is concerned about breaking meter seal, so whatever involved to get board to reseal.

6 carry out any essential work needed , and any essential bonding required to allow the work to be carried out.
Possibly no supp bonding to one bathroom.

7 Test as required and provide relevant paperwork

Thanks in advance for any replys
 
Sponsored Links
Definitely over £500 if tested correctly (PIR prior then EIC after board change).
 
cant see it so cant quote it,personally i dont think i could bring that in at under 500 quid
 
Thanks lads
I was thinking £300 just the gear
+ 1 to 2 days possibly with assistance to do the testing

Last one I done 2 years ago I said £100 to fit the board
By the time I brought the gear I got £20.

Wont do that again
Part P benefits me as I can Get out of Favour jobs now without feeling bad.
 
Sponsored Links
Looks over £500 to me with a major caveat about extras found when testing.
 
He was just gonna change the small board himself, to get a spare way, it already has a shower on it tho (No rcd ) .

It only has single 10 mm feeding it, bodged in to the live side of the other board , that is fed with 10mm vir from the meter.
until I told him not a good idea.

He is getting some one to look, so I will find out what they say.

The cooker comes next week
Think he should have kept the gas one

Kitchen man said the switch can go in the cupboard
I always thought it had to be easily accesible
So hopefully he dont let him do it
I gave him my part p book so he has an idea what he will be paying for hopefully
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top