Am I alone here ??,
Ordered 2 bundles of 22mm pipe, on wed. night, due for delivery on friday, Friday came, no pipe, spark nicked all my runs, i.e floor boards lifted, drilled, etc, still no pipe, (no deliveries of pipe on weekends). Really had a lot of time for screw fix, waited nearly 11 days for a bundle of 15 mm, pipe, thankfully just stock refill. But really needed this 22 mm pipe DESPERATELY. I know they are moving, but i have to turn a crust as well.
Anyone else with the same problems ????.
Ordered 2 bundles of 22mm pipe, on wed. night, due for delivery on friday, Friday came, no pipe, spark nicked all my runs, i.e floor boards lifted, drilled, etc, still no pipe, (no deliveries of pipe on weekends). Really had a lot of time for screw fix, waited nearly 11 days for a bundle of 15 mm, pipe, thankfully just stock refill. But really needed this 22 mm pipe DESPERATELY. I know they are moving, but i have to turn a crust as well.
Anyone else with the same problems ????.