Hi.
So, it is basically the title.
Long version:
I am renovating our new place in the highlands, but I am doing it in 2 halves. One side gets done, then the other.
One of the things that needs to be done is take out the old rads and cap off the original 15mm pipes.
The issue is we need to keep some rads working A ND that the new place has concrete floors.
I would like to cut the the pipe flush with the floor level then cap it off internally. Is this possible?
If not what is my next avenue of attack to keep the capped off pipe as low as possible?
Cheers
So, it is basically the title.
Long version:
I am renovating our new place in the highlands, but I am doing it in 2 halves. One side gets done, then the other.
One of the things that needs to be done is take out the old rads and cap off the original 15mm pipes.
The issue is we need to keep some rads working A ND that the new place has concrete floors.
I would like to cut the the pipe flush with the floor level then cap it off internally. Is this possible?
If not what is my next avenue of attack to keep the capped off pipe as low as possible?
Cheers