I've stripped a lime plaster/lath ceiling back to 9x3 joists and will be replacing with 12.5 Fireline tapered board then taping (it won't be skimmed). The joists are centred at 18" but I'd like to double-board it.
Should I fit noggings(?) or will two layers of 12.5 Fireline be ok on the 18" span?
The ceiling is roughly 3.6m x 3.4m (if relevant).
Should I fit noggings(?) or will two layers of 12.5 Fireline be ok on the 18" span?
The ceiling is roughly 3.6m x 3.4m (if relevant).