I'm building a partition wall in our detached double garage using 89mm x 38mm stud beams.
I was planning on fitting 50mm celotex at 400mm intervals.
I have heard about having to leave an air gap and also seal it. can anyone please give me some advice on fitting the stuff correctly, I am using 12.5mm plaster board either side.
thanks
Darren
I was planning on fitting 50mm celotex at 400mm intervals.
I have heard about having to leave an air gap and also seal it. can anyone please give me some advice on fitting the stuff correctly, I am using 12.5mm plaster board either side.
thanks
Darren