Whats the best mix for the cement on an exposed pathway? I will be laying Victorian tiles on top of it so it wont actually be exposed.
I have to replace a small section after laying a water main. I was thinking 4:1 sand cement - does that sound right?
I have to replace a small section after laying a water main. I was thinking 4:1 sand cement - does that sound right?