Hi.
Wonder if anyone can point me in the right direction please, even though we know roughly what the problem is.
We have a Baxi Solo 3 PFL poiler, controlled by a Danfoss CP 715.
In normal use after the boiler goes off (timer stops on the 715) you can hear the CH pump working for 5 minutes then it turns off.
Now after the boiler goes off, when the timer finishes, the pump stays on.
We had british gas cover 6 years ago and the same happend then, so the guy change the PCB and all was fine.
So i'm guessing 'the PCB' has gone again. The only way to stop it running it to turn off the mains switch to the pump and CP715 (they must both be controlled through it.
Is PCB something i can replace myself, or does it require a corgi registered engineer to fix it? Anyone know roughly how much to replace it?
Many Thanks.
Paul
Wonder if anyone can point me in the right direction please, even though we know roughly what the problem is.
We have a Baxi Solo 3 PFL poiler, controlled by a Danfoss CP 715.
In normal use after the boiler goes off (timer stops on the 715) you can hear the CH pump working for 5 minutes then it turns off.
Now after the boiler goes off, when the timer finishes, the pump stays on.
We had british gas cover 6 years ago and the same happend then, so the guy change the PCB and all was fine.
So i'm guessing 'the PCB' has gone again. The only way to stop it running it to turn off the mains switch to the pump and CP715 (they must both be controlled through it.
Is PCB something i can replace myself, or does it require a corgi registered engineer to fix it? Anyone know roughly how much to replace it?
Many Thanks.
Paul