This is my first post on here, and I'm hoping someone can assist.
We are looking to move into a building which, currently, has D1 Planning Permission (non-residential institution), as a former College building.
The building has 3 floors.
We've put in an application to rent the middle floor.
However, we've been advise we should request Change of Use to 'Sui Generis'.
However, funds permitting, we'd like to expand to rent the top floor as well as soon as possible.
My question is....would we need to Change the Use a second time? Is it granted per space you rent, or is there a way we could have the use granted for the top floor ahead of actually renting it?
Any advice would be gratefully received
Thanks in advance,
Tim
This is my first post on here, and I'm hoping someone can assist.
We are looking to move into a building which, currently, has D1 Planning Permission (non-residential institution), as a former College building.
The building has 3 floors.
We've put in an application to rent the middle floor.
However, we've been advise we should request Change of Use to 'Sui Generis'.
However, funds permitting, we'd like to expand to rent the top floor as well as soon as possible.
My question is....would we need to Change the Use a second time? Is it granted per space you rent, or is there a way we could have the use granted for the top floor ahead of actually renting it?
Any advice would be gratefully received
Thanks in advance,
Tim