Hi just wanted opinion in the change of pipework required to move toilet. At present pan connector goes 90 degrees into floor void then accross and straight into stack.
Stack difficult to get to on first floor so to make any alterations would have to go through wall in kitchen to change connection for wc.
Was thinking of cutting back soil pipe under the floor in the bathroom, putting an elbow immediately from discharge stack up above the floor level then another 90 degree elbow along the wall to where the WC is to be sited. Obviously another 90 degree pan connector into pan from there. There will be the fall required
Is there any problems by putting the extra elbows on. Two will be in close proximity to the stack. Am thinking of potential blockages primarily.
Stack difficult to get to on first floor so to make any alterations would have to go through wall in kitchen to change connection for wc.
Was thinking of cutting back soil pipe under the floor in the bathroom, putting an elbow immediately from discharge stack up above the floor level then another 90 degree elbow along the wall to where the WC is to be sited. Obviously another 90 degree pan connector into pan from there. There will be the fall required
Is there any problems by putting the extra elbows on. Two will be in close proximity to the stack. Am thinking of potential blockages primarily.