hi all
just a quicky
I have been chasing in single and double socket boxes in single brick block today on a school extension
The finish will be a 12.5 mil single board dot and dab , the depth of my chase was 15 mil with 10 mil over the chase (25 mil boxes going in) the dry wall contractor advised me I could surface mount the boxes as the single board and dot and dab would be about 40 mil , this seems big to me bearing in mind the board is 12.5 mil surely the final finish wouldnt be 27.5 mil !
just a quicky
I have been chasing in single and double socket boxes in single brick block today on a school extension
The finish will be a 12.5 mil single board dot and dab , the depth of my chase was 15 mil with 10 mil over the chase (25 mil boxes going in) the dry wall contractor advised me I could surface mount the boxes as the single board and dot and dab would be about 40 mil , this seems big to me bearing in mind the board is 12.5 mil surely the final finish wouldnt be 27.5 mil !