Morning
We’re getting a climbing tower/frame for our son and wanting to put it towards the bottom of the garden. The issue is that it’s heavy clay soil and a sloping garden so it does get wet down there (I’ve put in a soakaway which has eased it during winter) My plan is to level and make a raised area with 100-150mm of play bark/rubber aggregate which the frame/tower will sit on.
How deep into the clay should I do the foundation slabs for the towers? They’re about a square meter each. For reference there’s about 300mm topsoil, then about 1000mm of clay then bedrock
We’re getting a climbing tower/frame for our son and wanting to put it towards the bottom of the garden. The issue is that it’s heavy clay soil and a sloping garden so it does get wet down there (I’ve put in a soakaway which has eased it during winter) My plan is to level and make a raised area with 100-150mm of play bark/rubber aggregate which the frame/tower will sit on.
How deep into the clay should I do the foundation slabs for the towers? They’re about a square meter each. For reference there’s about 300mm topsoil, then about 1000mm of clay then bedrock