- Joined
- 8 Oct 2019
- Messages
- 11
- Reaction score
- 0
- Country
So I filled a hole in my drive with cold lay macadam / tarmac that I got from wickes (I prepped properly with aggregate underneath). I used about 7 bags of the stuff as it was a fairy wide hole, I put down around 2 inches of tarmac in depth. 4 months later and the stuff is still soft. I read that it's because the solvent hasn't evaporated off, so I was thinking about heating the area up with a blowtorch to help evaporate the solvent.
Think this will work?
Think this will work?