I have a house with combi. It used to a be conventional vented setup with header, cylinder etc.
I want to change back to vented (solid fuel) system boiler setup but use gas boiler until biomass is installed.
Could there be some flow/ return dead legs under the boards to get back on to for my new cylinder (combination thermal store) to attached to?
They should be boiler flow, boiler return, DHW, heating flow.
Does everyone strip the copper tube out??