combi boiler - new rads sequence

Joined
21 Oct 2004
Messages
9,979
Reaction score
191
Location
Sussex
Country
United Kingdom
Right ive done a search and cant find the answer, so apologies if its been answered a million times before and i humbly accept im a dofus.

I have a vokera combi boiler that was intalled in our loft conversion and thinking ahead i asked the plumber to leave a couple of tails ready for me to add the new rad in the loft conversion. No problem so far, but once ive installed the rad and piping (he left a flow and return with a service valve on each.) whats the correct sequence to fill new rad and pipework?

cheers in advance
 
Sponsored Links
add rad: open valves, bleed rad keepin an eye on pressure. done.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top