Hello all.
I am currently pricing a job in a flat. We need to run a 42mm gas supply from the meter, which is in the basement, into the flat to supply a combi and gas hob.
Once we are into the flat, we will fit a secondary ecv and reduce to 28mm pipe for the remainder of the run.
I am aware that the 42mm run will need to be installed, commissioned and certificated by a commercial fitter. But my question is, once he has signed off the pipe work to the secondary ecv, can a domestic fitter commission the rest of the pipe work (28mm) and do the boiler, hob sign off?
I hope this is all clear, any questions, please let me know.
Thanks
I am currently pricing a job in a flat. We need to run a 42mm gas supply from the meter, which is in the basement, into the flat to supply a combi and gas hob.
Once we are into the flat, we will fit a secondary ecv and reduce to 28mm pipe for the remainder of the run.
I am aware that the 42mm run will need to be installed, commissioned and certificated by a commercial fitter. But my question is, once he has signed off the pipe work to the secondary ecv, can a domestic fitter commission the rest of the pipe work (28mm) and do the boiler, hob sign off?
I hope this is all clear, any questions, please let me know.
Thanks