Hi Guys,
i am building my own extension, anyhow, dug the footings, and laid a mot1 base and compacted it 2 to 3 inches at a go.
However is wringing wet..and its like walking on a sponge.
I assume i will need to let this dry out before i can doing anything with it.
so do i cover it with a tarpaulin to stop it getting any wetter, or do i let it get rained on so it washed all the muddy crap from the quary through so it drains properly?
All suggestions gratefully recieived.
cheers Adrian
p.s
10 Tons by wheel barrow isnt much fun..
i am building my own extension, anyhow, dug the footings, and laid a mot1 base and compacted it 2 to 3 inches at a go.
However is wringing wet..and its like walking on a sponge.
I assume i will need to let this dry out before i can doing anything with it.
so do i cover it with a tarpaulin to stop it getting any wetter, or do i let it get rained on so it washed all the muddy crap from the quary through so it drains properly?
All suggestions gratefully recieived.
cheers Adrian
p.s
10 Tons by wheel barrow isnt much fun..