Hi I have a 5 foot covered passageway between my house and so called out buildings , so brick work one side existing concrete slab the other which is at the highest point is a 5 inch step-down to 1 inch so I want to take the slope from the front back to to the back back door and level it up with the existing slab . The current floor is slabs 3x2 with a foot edge of cement . to the house wall .
how much of this do I Have to rip up , befor I can concert it over, calculator says I need .75 Mtr . do I need a joint between the existing concreat, or dowel bars or mesh the weight it will take is people and the occasional barrow i'm well below the house DPC