I have dug and levelled MOT type 1 ready for concrete.
1.2 cubic metres are needed. I stupidly assumed I could get a concrete lorry to turn up, run a hose approx 25m away into the shuttering and pour.
My now deceased father did this 15 years ago, quite easily - yellow pages, they turned up a week later.
Barrowing it myself would be pretty gruelling as is over unlevel ground.
Are there any other options excluding mixing it myself? The sheer amount of aggregate and bags would be a nightmare.
1.2 cubic metres are needed. I stupidly assumed I could get a concrete lorry to turn up, run a hose approx 25m away into the shuttering and pour.
My now deceased father did this 15 years ago, quite easily - yellow pages, they turned up a week later.
Barrowing it myself would be pretty gruelling as is over unlevel ground.
Are there any other options excluding mixing it myself? The sheer amount of aggregate and bags would be a nightmare.