I am self building a porch, have laid trench fill foundations now ready to lay DPC - 3 courses below ground, 2 above all in class B's. My drawings show the 2 skins tied and filled with lean concrete, are these both necessary ? Above DPC the walls will be solid blocks 265mm wide so no cavity. Will I be better or worse off with cavity filled or not ????