Single story extension footings. The structural engineer has specified C32/40 mix for the footings. I have told the concrete guys C40 to be on the safe side but now they are asking about ground conditions and any additives being required? Is this overkill? When i did the front myself i just asked the concrete firm for a footing mix and thats what i got.