I've got an existing slab there currently. Quite old and uncracked. I'm going to cut into it to build the foundations, but one end is 11cm lower than the other, so I need to pour some concrete to level it up
The garage is 4.6 by 6m so about 2.5m3 of concrete needed.
1. Can I use the same mix of concrete for this new overslab base as for the foundations (C20) and hence pour all in one go?
2. I'm tempted to put down a Damp Proof Membrane before pouring this new concrete with the aim of reducing future damp from teh floor. Is this possible for such a thin floor?
3. Apart from covering the concrete with plastic sheet to slow the drying, is there anything I should do to reduce teh chances fo this new slab cracking when it dries?
The garage is 4.6 by 6m so about 2.5m3 of concrete needed.
1. Can I use the same mix of concrete for this new overslab base as for the foundations (C20) and hence pour all in one go?
2. I'm tempted to put down a Damp Proof Membrane before pouring this new concrete with the aim of reducing future damp from teh floor. Is this possible for such a thin floor?
3. Apart from covering the concrete with plastic sheet to slow the drying, is there anything I should do to reduce teh chances fo this new slab cracking when it dries?