I'm getting a small garden office built - mostly built from wood, but pretty solid - total weight somewhere around 1.5 tonnes over a 3.2 x 2.2m area.
The company putting it in say it can rest on paving slabs, but that a concrete slab is better. They recommend a depth of 10-15cm.
I'm new to this, and on trying to order readymix concrete, the plot thickens (sorry...). Do I want C15, C20 or C30? What 'slump' do I want? Do I want polythene fibres mixed in with it?
People on the phone at each company I've rung have been helpful enough in their own right, but often contradict what I've just been told elsewhere, etc.
I've had quotes varying from £170 to £270 for the same quantity (1.3 m3) delivered - quite a variation.
How much hardcore should I aim to have under the slab? The ground is already well compacted soil. I've also been advised it's worth mixing some bits of metal etc in with the slab to reenforce it - comments?
Sorry to ask so many questions in one go. Just any comments or suggestions really... Thanks.
The company putting it in say it can rest on paving slabs, but that a concrete slab is better. They recommend a depth of 10-15cm.
I'm new to this, and on trying to order readymix concrete, the plot thickens (sorry...). Do I want C15, C20 or C30? What 'slump' do I want? Do I want polythene fibres mixed in with it?
People on the phone at each company I've rung have been helpful enough in their own right, but often contradict what I've just been told elsewhere, etc.
I've had quotes varying from £170 to £270 for the same quantity (1.3 m3) delivered - quite a variation.
How much hardcore should I aim to have under the slab? The ground is already well compacted soil. I've also been advised it's worth mixing some bits of metal etc in with the slab to reenforce it - comments?
Sorry to ask so many questions in one go. Just any comments or suggestions really... Thanks.