Hi all,
I have built a small extension 3mx8m but it extends from an existing extension so the floor area is now 6mx8m. I have excavated the old floor in order to put in insulation for underfloor heating.
My problem is I have a large oversite now and I can't get a ready-mix lorry close enough to the site, so I will have to knock the concrete up by hand. Can you pour the slab in two stages and how? It is having reinforcing mesh in and is going to be 150mm thick.
many thanks
I have built a small extension 3mx8m but it extends from an existing extension so the floor area is now 6mx8m. I have excavated the old floor in order to put in insulation for underfloor heating.
My problem is I have a large oversite now and I can't get a ready-mix lorry close enough to the site, so I will have to knock the concrete up by hand. Can you pour the slab in two stages and how? It is having reinforcing mesh in and is going to be 150mm thick.
many thanks