i recently had some concrete steps formed to the front entrance to my property. Once the concrete was laid the concrete was left uncovered. It subsequently rained and the weather has been extremely cold and damp since. The concrete therefore does not appeared to have cured and dried out and the surface seems to be spalling slightly in areas. Also when i removed the shuttering to one step the face looked like it needed smoothing over. Are there any tips for remedying this problem. It has been 11 days since the concrete was laid.