I have some precautionary underpinning to do before an extension adds a second floor to an existing wall. It's only about 1m2 so planning to mix on site.
Gone quite cold at the moment & wondering what the minimum temp is to be mixing concrete. It's in sheltered position if that helps.
Thanks in advance