I'm fitting a boiler on friday and have to run the condensate outside, under some decking and into a down pipe.
What constitutes acceptable lagging? Is it correct if I up-size the pipe I wont need to use lagging? I think the fall I need is 40 mm per metre??
Thanks guys, appreciate any help.
What constitutes acceptable lagging? Is it correct if I up-size the pipe I wont need to use lagging? I think the fall I need is 40 mm per metre??
Thanks guys, appreciate any help.