So I need to run a new water main 300m from the road to the house.
I may in the future look to get planning on a new build up the same lane and as it’s a fairly big job to trench 300 metres I’m thinking of future proofing the job and running it inside a 100mm pipe.
That way I can add another 32mm main if I need to or elec/gas without having to redig.
On the face of it mixing a water supply and elec in the same pipe seems silly but can it be done?
Thoughts?