I've just built a big deck outside with 4x2 C24 treated timber, (asked for C16 but hey not complaining).
Anyway i did all the calcs and checked spacings. Max span of beam (1.2m) Max span of joist 1.2m. Spacing of joists 600mm (approx).
Anyway, my question is what should i have used to connect the joists? I've used hangers wher i cant get to the back of the wall plate, and the rest i've screwed through with 3 m8 screws at each end. Is that enough?.. what are the ramifications of a small gap between the joist ends and the side of the beam? (just enough so you can see the screws?)
Anyway i did all the calcs and checked spacings. Max span of beam (1.2m) Max span of joist 1.2m. Spacing of joists 600mm (approx).
Anyway, my question is what should i have used to connect the joists? I've used hangers wher i cant get to the back of the wall plate, and the rest i've screwed through with 3 m8 screws at each end. Is that enough?.. what are the ramifications of a small gap between the joist ends and the side of the beam? (just enough so you can see the screws?)