I'm fitting a full downstairs bathroom and am unsure of the best way to plumb everything.
The floor has been dug up entirely so I hope to bury all the waste pipes for shower, bath, sink and toilet. The soil pipe runs the length of the room 18 inches below the floor level.
If I place the vent stack at the far end of the room, can I simply T in each of the waste pipes to the top of the horizontal soil pipe or should I run them into a manifold on the vent stack?
Any suggestions or guidance would be greatly appreciated before I make a mistake and case it all in concrete!
The floor has been dug up entirely so I hope to bury all the waste pipes for shower, bath, sink and toilet. The soil pipe runs the length of the room 18 inches below the floor level.
If I place the vent stack at the far end of the room, can I simply T in each of the waste pipes to the top of the horizontal soil pipe or should I run them into a manifold on the vent stack?
Any suggestions or guidance would be greatly appreciated before I make a mistake and case it all in concrete!