We started work a few weekends ago on a dwarf wall type conservatory approximately 3m2. After reading several posts on here we opted to dig the foundations to the same depth as the house foundations. Concrete was poured level to base of 3rd brick below exisiting damp course.
Outer wall of Conservatory is constructed of 3 courses of engineering bricks then DPC followed by 8 courses of face bricks. Inner wall has a course of concrete blocks to start then celcon blocks to bring it level with the outer wall (50mm cavity filled with insulation).
Our question relates to the oversite/base etc....after googling conservatory bases several sites show a similar cross section through the base consisting of the following......
Minimum 150mm Hardcore
Sandbinding
DPM
100mm minimum concrete
50mm screed
All of the aforementioned diagrams show the hardcore starting at the level of the concrete foundations with 3 bricks on the outer wall to the DPC.
If the height of 3 bricks is approximately 220mm............how do you squeeze 150mm hardcore, 10mm sand binding?, 100mm concrete & 50mm screed in?????.
I had also intended to install 50mm insulation in the floor as well....which would make the above even more impossible........
Answers on a postcard please........or alternatively.....on here would be most appreciated (am starting to think that this manual labour stuff is affecting the brain).
Outer wall of Conservatory is constructed of 3 courses of engineering bricks then DPC followed by 8 courses of face bricks. Inner wall has a course of concrete blocks to start then celcon blocks to bring it level with the outer wall (50mm cavity filled with insulation).
Our question relates to the oversite/base etc....after googling conservatory bases several sites show a similar cross section through the base consisting of the following......
Minimum 150mm Hardcore
Sandbinding
DPM
100mm minimum concrete
50mm screed
All of the aforementioned diagrams show the hardcore starting at the level of the concrete foundations with 3 bricks on the outer wall to the DPC.
If the height of 3 bricks is approximately 220mm............how do you squeeze 150mm hardcore, 10mm sand binding?, 100mm concrete & 50mm screed in?????.
I had also intended to install 50mm insulation in the floor as well....which would make the above even more impossible........
Answers on a postcard please........or alternatively.....on here would be most appreciated (am starting to think that this manual labour stuff is affecting the brain).