I'm in the process of moving house and the new house has recently had a conservatory built professionally along the width of the house back. The owner assures me that the conservatory does not require planning permission due to its size and glass percentage. I'm ok with this but since the build was completed the owners have built a fully fited kitchen turning it into a kitchen conservatory. This includes a sink and dishwasher, which obviously requires drainage, and a self installed gas cooker which has not been corgi registered. The owner has informed me that technically he should have obtained building regs for the drainage but that it wont be an issue after 2/3 years time..
Is this right or am I setting myself up for problems in the future if I was too sell? The electrics have all been done with building regs.
any advise would be appreciated.
Is this right or am I setting myself up for problems in the future if I was too sell? The electrics have all been done with building regs.
any advise would be appreciated.