Hiya,
I am installing a new selfbuild conservatory soon and am after some Lead advise,
I've had a look around on here and found that i should have approx 20mm in the wall, a 150mm upstand and 100mm down over the roof - does this sound about right? I have also read that the lead shouldbe in lenghts no longer than 1500mm, is this really neccesary for a 3000mm wide structure?
Also, how far past each side of the roof do i need to go? and do the vertical ends just "stop" or should they be cut in down the wall as well?
Thanks
D